
Concrete Floors (Grinding/Polishing) SWMS | Safe Work ...
This Concrete Floors (Grinding/Polishing) Safe Work Method Statement (SWMS) outlines the general use of a floor grinder/polisher on concrete floor. Included in this SWMS is planning and preparation, training and competency requirements, and impregnating and/or protecting concrete.

polished concrete method of statement
Floors (Grinding Floors (Grinding - Polishing) Safe Work Method Statement This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the use of a floor grinder/polisher on an indoor concrete floor using the HTC Superfloor system Ready to Use...

Method Statement for Concrete Works – Method Statement HQ
Dec 02, 2018 · Method Statement for Concrete Works. This method statement describes the practices and methods to be used with regards to placing, curing and defect rectification of concrete works & blinding concrete. Prior to the placing of any concrete all quality checks are to be completed and the “approval to concrete” instruction issued by client/consultant.

Concrete Grinding Tools, Methods and Basic Tips
Dry and Web Methods. You can grind the concrete using two methods: dry and wet. In the wet method, water is required to cool the diamond grits and cleaning the dust that is formed while grinding process. In this type of grinding, water works as lubricant, simmers down the friction and elevates the life of polishing equipments,...

Safe Work Method Statement - Flooring Tech
Wear a dust mask when grinding and sweeping up Use a vacuum cleaner where possible to pick up dust . Mix and install K15 smoothing compound

Method of Statement Construction of Flat Concrete Floor ...
All concrete to be discharged into the pouring area shall follow good concrete placing method. 7.3.Vibrating concrete During concrete discharge, wet concrete shall be vibrated with a poker vibrator especially at edges or beam area. The vibrator shall be inserted vertically into the concrete. 7.4.Floor finishing consists of five major steps

Floor Grinder SWMS | BlueSafe Solutions
The Floor Grinder Safe Work Method Statement is a comprehensive SWMS Template which is highly comprehensive and pre-filled and ready for immediate use after adjusting it …

Polished Concrete Process - Steps for Polishing Floors ...
With dry polishing, no water is required. Instead, the floor polisher is hooked up to a dust-containment system that vacuums up virtually all of the mess. Many contractors use a combination of both the wet and dry polishing methods. Typically, dry polishing is used for the initial grinding steps, when more concrete is being removed.

How To Diamond Grind A Concrete Floor - YouTube
Jan 23, 2017 · How to diamond grind a concrete floor to the correct concrete surface profile required before installation of an epoxy or urethane coating. https://www.found...

Method Statement For Concrete Coring & Cutting – Method ...
Method Statement For Concrete Coring & Cutting. Before commencing any activity on site, the consultants must be notified. All the related documents, shop drawings, method of statements, material approvals, subcontractor’s approvals and test certificates etc. …

Method statement for repair of concrete surface
Nov 20, 2014 · Method statement for repair of concrete surface. 1. TABLE OF CONTENTS 1. GENERAL 2. INVESTIGATION AND EVALUATION OF DAMAGED CONCRETE SURFACES 3. CONCRETE REMOVAL 3.1 Impacting method (for honeycombed and exposed re-bar) 3.2 Grinding (for abrupt or gradual irregular surfaces) 3.3 Cutting 3. SURFACE PREPARATION 4. REPAIR …

Floor grinding - concrete grinding
For nearly 50 years, scarifying and shot blasting machines have looked and functioned the same. For those who still believe that these methods are the smartest way of machining a floor, it’s time to think again. The development of HTC’s machines and tools means that there is no longer any reason at all for continuing to use old-fashioned methods and equipment.

Concrete Grinding/ Polishing Procedure Cheat Sheet (for ...
Concrete Grinding/ Polishing Procedure Cheat Sheet (for existing concrete slab s) Prep for Grinding . Size of Floor, which Grinder is needed? Edges – will edging need to be done, how much, are there corners? Condition of floor – does floor need patching, crack chasing, and will the expansion joints be filled or left open?

Method Statement for Pouring Concrete on Slab on Grade
The purpose of this method statement is to explain the proper procedure on how to prepare and cast slab on grade or any horizontal element or member including fixation of steel reinforcement, MEP embedment’s, fixing of shutter etc. without injuries.

METHOD STATEMENT SCREEDING OF FLOOR
METHOD STATEMENT SCREEDING OF FLOOR Series: MS Series & Number MS005 Issue Date: 14th November 2011 Revision Number 2 Revision Date 30TH October 2011 Page 6 of 8 Tenant safety & protection of tenant’s goods and décor It is the responsibility of the principal contractor to advise tenants of works to be carried out,

Polished Concrete Floors - Making Procedure and Benefits
Polished concrete floor surface is made by a mechanical process of grinding and polishing with the help of a penetrant stone to provide different texture. The polishing of concrete is a multi-step process which requires specialized tools and equipment.

Method Statement for Formwork, Reinforcement and Concrete ...
This procedure is developed for the construction execution of form, reinforcement and concrete works for _____ (Project Name) at _____ (City Name). The latest revision of the project specifications shall be used as references and is part of this Method Statement in the execution of work. The timber formwork is to be used when limited reuse of ...